Onderzoek: Bijdrage aan het onderhoud van vervaardigingsmachines met tijdsbeperkingen – Een melkverpakkingsunit
Researchers at the National School of Engineering of Tunis studied and designed a maintenance module based on Petri nets (PNs) for manufacturing job-shops with time constraints.
To illustrate the effectiveness and accuracy of the proposed maintenance approach, a milk packaging unit is depicted. The products (bottles of 1000 ml) are placed on the conveyor to supply the packaging machine, where they will be wrapped by welding in a group of 6. The finished products are deposited on the output conveyor towards the stock of finished products. An article about the research is published in the International Conference on Control, Engineering & Information Technology (CEIT’14) Proceedings.
Klik hier voor het artikel (353 kB).
Dit bericht is ook opgenomen in ons maandelijkse overzicht, de NVC Members-only Update. Heeft u vragen, neem dan contact met ons op via e-mail of bel: +31-(0)182-512411.